Skip to content

Roadmap

The build follows this order.

Six lines. Two are on the site, two are in build, and two are next.

  1. 2026 Q1

    Shipped

    Wallet shell

    You can open the preview and see the savings screen.

  2. 2026 Q2

    Shipped

    Savings term

    You pick 30 to 365 days and read a range on this page.

  3. 2026 Q3

    In build

    Public docs

    The docs hold the keys, the term, the shares and the reviews.

  4. 2026 Q3

    In build

    Second review

    Brant Review House is reading the staking term.

  5. 2026 Q4

    Next

    Board beside the docs

    Threads on the docs page point at each article.

  6. 2026 Q4

    Next

    Rate history

    A list of past ranges. The list still says rates vary.